Hopewell Valley Engineering, PC (HVE) prepared a Topographic Survey and Shoreline and Dam Restoration plans for this project. The work included the restoration of the failing Ceva Lake Dam and eroding shoreline by removing and replacing the existing primary spillway, raising the top of the dam and providing a new gabion mattress emergency spillway.
HVE provided construction inspection services during the construction of the improvements. An updated Operation and Maintenance Manual and Emergency Action Plan was prepared for the newly improved dam.
Please contact this office if you need surveying and engineering work done on your next project.
About the Author
Russ Smith